Kolektor Etra

Slovenian manufacturer of power, generator step-up and distribution transformers. Its power range reaches 500 MVA and 420 kV; distribution units start at 50 kVA.

PowerDistributionEU plant

Verified

Visit Kolektor Etra Compare with others Request a quote

500MVALargest rating
420kVHighest voltage
50kVASmallest rating

Facts

Source per value
Segment Power when the maker publishes power, GSU, HVDC, autotransformer or reactor products or a rating above 20 MVA; Distribution when it publishes distribution, pad-mount, pole-mount, network or dry-type products; both when it publishes each. Derived from Transformer types and Largest rating.
Power and distribution 1
Transformer types Product types the maker lists, separated by semicolons: power, GSU, autotransformer, HVDC, shunt reactor, substation, distribution, pad-mount, pole-mount, network, dry-type (cast resin, VPI), mobile, rectifier/industrial, renewable and data center lines.
power; GSU; autotransformer; distribution; dry-type; furnace; rectifier; traction 1
Largest rating MVA Largest verified published rating in the cited product or regional scope, in MVA. Product range identifies base, forced-cooling, phase-shifter throughput or group-history claims; these rating bases are not interchangeable. Planned future ranges are described separately.
500 1
Smallest rating kVA Smallest published rating, in kVA. Shows how far down the distribution range a maker goes.
50 1
Product range The kVA/MVA range as the maker states it, by product line.
Power and GSU up to 500 MVA; Series 8 distribution 50-1,600 kVA 1
Highest voltage kV Highest voltage class the maker publishes or has delivered, in kV (AC system voltage; HVDC noted under Voltage classes).
420 1
Voltage classes Voltage classes and BIL as the source states them, by product or plant.
Power up to 420 kV; Series 8 distribution up to 24 kV 1
Plants Transformer manufacturing locations, city and country. Planned plants carry their target date. Location lists identify verified sites and may not cover every factory in a global group.
Ljubljana, Slovenia (power transformers); Belgrade, Serbia (medium power transformers) 2
Plant countries Countries with verified operating transformer manufacturing in the cited scope; not necessarily the complete global footprint. Component and service-only sites do not establish new-unit manufacturing.
Slovenia; Serbia 2
US plant Yes when an operating US transformer plant is verified; No when the source shows the maker's plants and none is in the US. Empty means not verified.
Not published
EU plant Yes when an operating transformer plant in an EU-27 country is verified (the UK, Norway, Switzerland and Turkey do not count). Empty means not verified.
Yes 2
Capacity expansion Announced transformer capacity expansions: amount in the original currency, place, announcement date, target date and output change. US and EU projects first.
Not published
Largest US/EU expansion $M Largest single announced US or EU transformer capacity investment, in US$ millions, where the source states a dollar amount. Euro amounts stay in Capacity expansion unconverted.
Not published
Expansion region Where the announced capacity expansions are: US, EU, both, or only elsewhere (Other).
Not published
Certifications and standards Quality certifications, listings and design standards the source names (ISO 9001, IEEE C57, IEC 60076, EU Ecodesign Tier 2, utility approvals).
Series 8: EU Ecodesign Tier 2 1
Data center offer Yes when the maker markets transformers for data centers or has disclosed a data center transformer order. Empty means not found.
Not published
Data center product or order The named data center line, or the disclosed order with value and date.
Not published
Parent or owner Parent company or owner where the source states one.
Not published
HQ country Country of the maker's headquarters.
Not published
HQ region Region of the maker's headquarters.
Not published
Legacy brands and names Sourced former names and acquired transformer businesses, retained on the current maker row to avoid duplicate supplier counts.
Not published

Sources

  1. Kolektor Etra: manufacturing program accessed 2026-11-11
  2. Kolektor Etra: production program by plant accessed 2026-11-11

Get a quote from Kolektor Etra and similar makers

Tell us what you need once. We send it to matching makers and they reply to you directly.

Quote requests open shortly. To get in first, email hello@transformervendors.com.